Erection, Testing & Commissioning and Services:
                           ETC Substations up to 400 KV class in AIS, GIS and other Utilities in Pan india basis. Erection and service of Transformer from the range of 1 MVA to 500 MVA. Erection Testing and Commissioning supervision services for all type of plants and industries throughout India.
• Generator Testing and commissioning
• Installation, Testing and commissioning of all type of Transformers
• Installation, Testing and commissioning of all type of CT,PT,CVT ,LA &Isolator’s
• Installation, Testing and commissioning of all type of panels
• Protection Relay settings and configuration
• Scheme checking and panel wiring modification activities
• Illumination works • Cable tray fabrication and installation
• Cable laying &Termination work • Earth pit construction
• Lightning works • Online/Off line Energy meter calibration
• Online Energy management – EMS in Solar sector’s
• Scada, Automation &Instrumentation works
• Thermal Inspection

Overhauling /Refurbishment activities:
Refurbishment &Overhauling of Transformers Range from 100 KVA to 250 MVA & Line reactors up to 50 MVAR. LT& MV switchgear refurbishment
• Overhauling of Generator up to 50 MW.
• MCC &PMCC,HT &LT panels refurbishment
• Overhauling of HT &LT motors .
• 10 KL/ hour Transformer Oilfilteration Up to 500 MVA .
• Manpower having High skilled with sufficient tools. RLA –Residual life assessment
• Residual life assessment of Transformer up to 400 KV class level.
• Dielectric frequency response analysis
• Online AE Technique) &High frequency PD testing for GIS.
• Sweep frequency response analysis
• Capacitance and Tandelta test as per IEEE C57
• RSO Recurrent surge oscillogram )for Generators
• Assessing the internal characteristics of circuit breaker 0MV,HV and EHV)
• Diagnostic studies of Generator. Equipments diagnostics up to 400 KV Substation. Diagnostic Testing for OSTG/HTG/GTG)
• Partial discharge measurement by abiding the IEC 60270
• Recurrent surge Oscilloscope
• Capacitance and Dissipation factor/power factor measurement by abiding the IEEE C57
• DC high voltage test for stator windings
• Wedge tightness identification using soft hammer
• Pole drop test • Electro magnetic core imperfection detection Diagnostic of HV &EHV Circuit Breakers
• Dynamic Contact Resistance measurement
• Arcing/Wiping contact Resistance measurement
• Over travel measurement
• Moving contact Travel measurement
• Dew point measurement
• Bounce Measurements between the Auxiliary contacts
• Timing measurement Diagnostic in HT&LT Motors
• Electrical signature Analysis
• Surge comparison tester
• Partial discharge analysis
• Capacitance measurement
• Winding resistance measurement • Power factor/Tandelta measurement • Harmonic Analysis • Vibration analysis • Noise measurement.
MV CABLE TESTING:
MV cable VLF testing VLF testing method utilize AC signals in the frequency from 0.01 Hz to 0.1 Hz VLF testing methods can be categorized as withstand or diagnostic. In withstand testing, the object must withstand a specified voltage applied across the insulation for specified period of time with out breakdown. The magnitude of with stand voltage is usually greater than that of applied voltage. If the cable insulation is sufficiently degraded a breakdown can occur. The cable system may be repaired and the insulation retested until passes the withstand test. Cable testing standard :

We love to Create a Gallery 


Welcome to our website

Add a description here.

Follow Us

Add a subtitle here.